Based on that meter test, it looks to me like your assumption was INCORRECT by connecting a Hot wire to the Load terminal on the switch ![]()
Based on that meter test, it looks to me like your assumption was INCORRECT by connecting a Hot wire to the Load terminal on the switch ![]()