You can do what you are looking for.
Group EP1’s of all switches and lights together.
Bind EP2’s of all individual switches to that group.
then you have 3+ “remotes” for 1 “light group” that includes the dimmers.
Remember to wire smart, meaning all switches will have hot/neutral at all times, no traveller, and only one will be the load switch which will need to be in SBM.